top of page

Mainline services

Our longer distance services on the mainline connect customers with key towns and cities including Woking, Basingstoke, Southampton, Bournemouth and Weymouth, serving communities across Surrey, Hampshire and Dorset. The line supports a wide range of journeys, from commuting and business travel between major centres to leisure trips and visits to the South Coast. These are some of the busiest routes on the network, particularly on the key corridor between Woking and London during the morning and evening peaks. Our services also share parts of the railway with freight trains travelling to and from terminals on the South Coast, which means the available capacity must meet the needs of both customer and freight services.

Overview

From the engagement we’ve carried out so far, we know our customers and stakeholders value good connectivity between the major hubs on our longer-distance routes. To support these customer journeys, and to match capacity to demand on this important part of the network, we’re introducing targeted additional services to support peak commuter travel from December 2026, improving Sunday connectivity from May 2027, and proposing to add further regular services during the December 2027 timetable period. 

The corridor between Southampton, Basingstoke, Woking and London Waterloo is particularly congested, and we know that additional services will add strain on the network. So to balance uplifting the service with maintaining resilience and reliability, we’re seeking your views on when through the day additional services should be added into the timetable. The introduction of these services is likely to be phased, starting with those times of day that bring the greatest benefit to customers. We’re also seeking your views on where new services should call. 

Incremental changes 

We’ve heard our customers and stakeholders and we know your top priority is a reliable service. So we’re bringing forward improvements to the timetable as quickly as possible as shown in the table below:

Monday to Friday: Our long-distance services towards Weymouth, via Winchester and Southampton, typically run twice per hour throughout the day, with additional services in the morning and evening peaks. There are 8 “fast train” arrivals at London Waterloo between 0700 and 0900, having called at stations such as Winchester, Basingstoke and Woking. 

Additionally an hourly stopping service operates between Winchester, Southampton and Bournemouth throughout the day.

Saturday: Our long-distance services towards Weymouth, via Winchester and Southampton, typically run twice per hour throughout the day. 

Additionally an hourly stopping service operates between Winchester, Southampton and Bournemouth throughout the day.

Sunday: our long-distance services towards Weymouth, via Winchester and Southampton, typically twice per hour throughout the day. In the early part of the day one service attaches / detaches at Eastleigh with a portion operating through to Portsmouth Harbour. 

Consultation questions

From December 2027, we intend on adding additional long-distance services on this line to London Waterloo.

The corridor between Woking and London Waterloo is particularly congested, and we know that additional services will add strain on the network. So to balance uplifting the service with maintaining resilience and reliability, we’re seeking your views on when through the day additional services should be added into the timetable. The introduction of these services is likely to be phased, starting with those times of day that bring the greatest benefit to customers.

Key times

Would you prefer an additional hourly service throughout the day or targeted additions at key times of the day? An extra service every hour, while providing significantly more capacity, is likely to have greater impact on overall network resilience, whereas more targeted additions at key times of day will deliver benefits where they are needed most, with less impact on resilience.


If we introduce services on a more targeted basis, when would you most value these additional services?

Morning Peak.png
AM Peak

0630–0930: Additional commuter services

Daytime Services.png
Through the day

1000–1600: Off-peak services, primarily serving leisure travel through the day

Evening Peak.png
PM Peak

1630–1930: Additional commuter services

Evening Service.png
Evening Services

After 1930: Additional services supporting travel after the evening peak

Additional services

Where should additional services call at north of Southampton Central, recognising the balance between end-to-end journey times and local station connectivity?


  • Southampton Airport Parkway

  • Winchester

  • Basingstoke

  • Woking

  • Other


Where should additional services run to and from? (Select one)


Option A: Bournemouth

Option B: Poole

Friday peak services

To reflect changing customer travel patterns on Fridays, we propose removing a small number of peak-only services across the mainline network:


  • 07:13 Basingstoke to London Waterloo

  • 06:24 Portsmouth Harbour to London Waterloo (via Eastleigh, starting at Basingstoke)

  • 19:15 London Waterloo to Southampton Central (via Portsmouth Harbour and Fareham)


We want to balance our timetable with actual travel demand while ensuring we continue to support key community connections, including school and college journeys.


Feedback Prompts:

  • Please let us know whether you support our proposed adjustments to Friday peak services as we work to balance capacity with customer travel patterns.

  • If you are aware of specific key journeys—such as school or college travel flows—that we should consider when finalizing our Friday timetable, please share your feedback with us.


Explore the 6 timetable options

Review our proposed options for the West of England line and tell us which changes matter most to your journey.

Share your thoughts here

bottom of page